Week in Review: Accomplishments and Progress
Concrete foundation work is now complete. Crews began masonry construction on the trailer enclosure in the North Alley, completing the east block wall and starting work on the west wall behind The Freeze.
In addition, the primary conduit burial for the utility work in the North Alley was completed. The trench was backfilled with stone and capped with concrete. Work on the secondary conduit is pending.
Looking Ahead: Planned Activities
Next week, the contractor anticipates completing brick and stone work on the trailer enclosure, weather permitting. Installation of secondary pedestals and transformer pads in the North Alley is pending a revised plan set.
Community Impact: What to Expect
A small section of parking behind The Freeze is being utilized for staging equipment. As utility work continues in the North Alley, the Slusser Street exit will be closed periodically, with traffic being redirected to Hawley Street as necessary.
Construction signage has been placed in the downtown area in preparation for the 2025 Road Program. Work related to this program is expected to begin soon. Residents, patrons, and visitors are encouraged to exercise caution and be aware of signage and flaggers identifying changes in vehicle and pedestrian traffic within the project area.
Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.