Week in Review: Accomplishments and Progress
This past week, the contractor completed backfilling the footings and foundation walls for the trailer enclosure behind The Freeze. The concrete pad in that same area was also poured. In the North Alley, crews potholed and exposed existing gas services along the proposed electrical alignment and installed new conduit across Slusser Street.
Looking Ahead: Planned Activities
Next week, the contractor plans to remove concrete forms from the newly poured pad behind The Freeze. Conduit installation is anticipated to continue within the North Alley, weather permitting.
Community Impact: What to Expect
A small section of parking behind The Freeze is being utilized for staging equipment. As utility work continues in the North Alley, the Slusser Street exit will be closed periodically, with traffic being redirected to Hawley Street as necessary.
Looking ahead, road construction and resurfacing associated with the 2025 Road Program are anticipated to begin in the downtown area the week of April 1st. Residents, patrons, and visitors are encouraged to exercise caution and be aware of signage and flaggers identifying changes in vehicle and pedestrian traffic within the project area.
Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.